Thanks for that Neville.
I wish to record the costs and quantities using the machine centres as you said.
However, I would like to record the hours per Machine operator, which is why I was thinking of Resources.
The only reason I can see to use the Dimensions is that I can easily associate the Machine Operator with the output journal - which I need to do.
If I could find a way to associate the Resource ledger (for the operator hours) with the output journal ledger that would be perfect. We could make use of the time sheets, resource skills etc. provided by the resources module.
Is there a way to link the two ? (Resource machine operator hours / Output quantities) ?
or are Resources really not supposed to be used with Manufacturing ?
Thanks
Dave Kuziara